0 items

17th September 2018

BADMINTON SCHOOL

Read More


















30th November 2017

BENSHAM MANOR SCHOOL

Bensham Manor School contacted us initially wanting a timber trail. Having discussed their requirements, we agreed with the school that our Recycled Plastic products
would be a wiser long-term investment.

Read More

21st November 2017

ST. MARIE’S LEARNING

We were asked by St. Marie’s Learning, Sheffield to replace their old trim trail that had become unusable.

Read More

13th October 2017

Timber Train at Bodelwyddan Castle

Physical activity benefits both physical and psychological well-being!

The largest smartphone-based study examining the relationship between physical activity and happiness has found that even minimal levels of activity can have a positive effect on happiness.

Read More

7th October 2017

SOVEREIGN PLACE PLAY AREA

We were asked by Hazelvine to upgrade the existing playground. We removed the old equipment, installed a Toddler Town in Recycled Plastic, along with a Springer. Installed with PlayBond surfacing. We then refurbished the fencing with a sand down and respray.

Read More

25th September 2017

ALDEBURGH TOWN COUNCIL

We were asked by Aldeburgh Town Council to design and install a new play area using play equipment manufactured from Recycled Plastic, to replace their old timber equipment.

Read More

3rd September 2017

Community Project Funding

The Aviva Community Fund, launches on 12 September 2017 to give community projects, including those working in sport and recreation, the chance to win funding that will change lives.

Read More

21st August 2017

BOWLEE PARK SCHOOL

We were asked by Bowlee Park School to design a trim trail and central climbing frame – manufactured from Recycled Plastic. We designed a trim trail ideal for use by KS1 pupils, and a Strength Square in the centre for use by older children. Installed with PlayBond surfacing.

Read More

5th August 2017

Primary schools urged to take lead on family fitness!

Primary schools can help spearhead a national drive to improve family fitness by signing up to a pioneering new health and wellbeing program for pupils and their parents.

Read More

29th July 2017

Beaumaris Castle

The client had some existing metal play equipment which required replacing. They removed these items, and then we manufactured, supplied and installed a timber Twin House Activity Centre and grass mats.

Read More

21st July 2017

THE FROEBELIAN SCHOOL

We removed and disposed of the old play frame which was condemned. We then supplied and installed a new timber modified Fun Trail 2, along with 3 pieces of outdoor gym equipment – complete with Wetpour repairs.

Read More

29th May 2017

British children some of the least active in the world, new report claims.

England and Wales score a ‘D minus’ when it comes to overall physical activity but Scotland is at the joint bottom of the table with an ‘F’. British children are among the least active in the world, an international study has warned.

Read More

8th May 2017

Virgin Active creates ‘new way to teach PE’

A new approach to physical education (PE), based on physical literacy and “fun fitness”, could transform school sport and help all children embrace physical activity – according to its creators. Developed jointly by health club operator Virgin Active and the University of Bedfordshire, the Playmakers programme is the result of a one-year pilot initiative involving 30 primary schools and 7,500 pupils across the UK.

Read More

30th April 2017

Hexagon Tower at Bodelwyddan Castle

Make outdoor play the norm for our children.

With a sunny start to April and the longer days ahead, you might begin to see the streets and green spaces of Scotland filled with children and wonder: is it not always so? Sadly, like the rose-tinted memories of endless childhood summers, it isn’t. But it could be.

Read More

20th April 2017

Bellfield School

We were asked by Great Outfloors (an artificial grass supplier and installer) to partner with them in designing, supplying and installing a bespoke trim trail and additional equipment, all manufactured from Recycled Plastic. After consultation between ourselves and the school, the equipment was confirmed and installation carried out during the week of 10th April 2017…

Read More

21st March 2017

FRYERN JUNIOR SCHOOL

Client requested one of our Outdoor Primary School Gym equipment packages – with additional items and Balance Beam – installed with Grass Mats around each piece and linking the items together.

Read More

13th March 2017

St. John Bosco CP School

We were asked to supply and install some outdoor gym equipment at St. John Bosco CP School – so they had our Primary School Gym Pack 3 – 5 items of Children’s gym equipment designed for use by Key Stage 2 pupils.

Read More

21st February 2017

Bythams Primary School

Bythams School wanted to replace their old timber trim trail – so they arranged for this to be removed – and then we manufactured, supplied and installed our Budget Trail 2 manufactured from Recycled Plastic – including replacing an existing timber spring wobble board with a recycled plastic top.

Read More

21st February 2017

GREAT MARSDEN ST. JOHN’S PRIMARY SCHOOL

The client wanted a recycled plastic trim trail that would be suitable for their grassed area – which held water and would get boggy when wet. We installed a Budget Trail 2 made from Recycled Plastic – with PlayBond surfacing – and additional stone base underneath to assist drainage.

Read More

9th February 2017

Talsarnau Village Play Area

Talsarnau Village Park Committee approached us to discuss the design and installation of new play equipment for a dedicated new play area in their village. Having discussed several designs – as well as material options – they opted for one of our All-Play 2 High Level multi-play frames – manufactured from Recycled Plastic.

Read More

16th September 2016

Great & Little Shelford CE Primary School

Budget Trail 2 and PlayBond safer surfacing installed at Great & Little Shelford School, Cambridge. We also install PlayBond safer surfacing around an existing play structure. Installed in September 2016.

Read More

21st June 2015

KNEBWORTH PARISH COUNCIL

Knebworth Parish Council contacted us to design and install a play area – including a large centre-piece climbing frame, surrounding trim trail, safer surface & fence.

Read More

10th August 2014

HILL VIEW JUNIOR SCHOOL

The client wanted a large stand-out play area in their playing field, so we supplied and installed a bespoke 4-Tower Activity Centre, an Adventure Trail surrounding it, PlayBond surfacing and Anti-Climb security fencing.

Read More

X

Request a Brochure

If you’d like a copy of our brochure please fill in the form below and one of the team will get back to you.